Case Studies

Siemens S5 to S7 Migration

Siemens S5 to S7 Migration Safeguarding Operations at BHS Check In The objective of this project was to Safeguard the check-in and associated baggage handling system at T4 to enable the major phasing works required for the HBS upgrade in order to achieve the DfT date by providing the airport

Read More »

LHR Terminal 4 OPC Server Upgrade

LHR Terminal 4 OPC Server Upgrade Project Background This project was driven by a need for change arising from the deployment into the Terminal 4 Production environment of a new model of PLC. Heathrow Airport Ltd. (HAL) mandate that for components of the Baggage Handling System, manufacturer technical and product

Read More »

Food and Beverage Success Story

Food and Beverage Success Story A food processing plant with limited space on its existing plant needed to find a way of increasing productivity while staying within the existing system footprint.  Using modern sugar feed delivery techniques, improved product mixing, canning, and lidding machines integrated with the existing system the

Read More »